List Of Job Experience

2021

Piping Work – Storage TDI & POP Tank Extension Work – PT. Serim Indonesia Project
PT. Serim Indonesia, Cikande – Serang , Banten

Refractory Shop Application for CO Boiler Bypass Stack RDMP RU V – Balikpapan Project
PT. HANAZONO ENGINEERING INDONESIA, Bojonegara – Serang , Banten

2020

Piping Work – Storage TDI & POP Tank Extension Work – PT. Serim Indonesia Project
PT. Serim Indonesia, Cikande – Serang , Banten

Refractory Shop Application for CO Boiler Bypass Stack RDMP RU V – Balikpapan Project
PT. HANAZONO ENGINEERING INDONESIA, Bojonegara – Serang , Banten

2019

Mechanical Work – Installation of Device of ASC Coal Crushing & Conveying System
PT. Asahimas Chemical – Anyer – Banten

Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)

Shut Down Maintenance Work Project
PT. STANDARD TOYO POLYMER, Cilegon, Banten, Indonesia

2018

Refractory Lining for Channel 4A-102-C
PT. Daekyung Indah Heavy Industry – Cilegon – Banten

Refractory Lining for Channel EA-304
PT. Daekyung Indah Heavy Industry – Cilegon – Banten

Replacement Top Shell R-051 at PT. SAU
PT. Daekyung Indah Heavy Industry, – Pengoreng – Banten

Steel Structure KALSEL-1 Coal Fired Power Plant Project
PT. Hans Jaya Utama, – Tabalong – Kalimantan Selatan

Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)

Repair Insulation Main Steam Project
PT. CIKARANG LISTRINDO, Bekasi

Expander Perlite Filling Pupuk Kaltim Project
PT. REKON SARANA UTAMA, Kalimantan

OSBL 300MTD PKO Fractionation Project
PT PARAMITA BANGUN SARANA, Lampung

SRI Project
PT INTI KARYA PERSADA TEHNIK, Cilegon, Banten

Waste Water Line From WWCP Glycerine Tank Project
PT PARAMITA BANGUN SARANA, Marunda

Insulation Tanki KB R.105 Area Tanki Farm KB PH3 Project
PT WILMAR NABATI INDONESIA, Gresik

Replacement Bottom Plate Tank T-207 Project
PT. REDECO PETROLIN UTAMA, Pengoreng Site, Banten, INDONESIA

Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)

Replacement Bottom Plate Tank T-207 Project
PT. REDECO PETROLIN UTAMA, Pengoreng Site, Banten, INDONESIA

2017

Installation of Device of ASC Coal Crushing & Conveying System
Potent Mechanical & Industrial (Xiamen) Co., Ltd

Piping Work M17 – 35 for PT. Dongsuh Indonesia Project
PT. Daekyung Indah Heavy Industry – Cikande – Banten

Mechanical Work for Samheung MDF – 10092 and Installation Project
PT. Samheung Indonesia, Bekasi – Jawa Barat

Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)

OSBL Texturing Piping Line 7 Project
PT WILMAR NABATI INDONESIA, Gresik

Block A GAS Development Project
PT. REKON SARANA UTAMA, Aceh

P4 RM EP Convertion to bag filter Project
PT BARATA INDONESIA, Bogor

200 MTPD CPKO Fractionation Plant#3 Project
PT DOMUS JAYA , Lampung

Insulasi Completion Commissioning Biodiesel 1 Project
PT SEMEN PADANG, Padang

Insulation Piping & Equipment Project
PT JFE SHOJI TRADE INDONESIA, Tangerang – Banten

RBDCNO Line From Small Tank Project
PT PARAMITA BANGUN SARANA, Marunda

Water Ejector Skid Project
PT. APECO KENCANA, Babelan

Emulsifier Texturing Pping Project
PT WILMAR NABATI INDONESIA, Gresik

Tank Farm SF Piping Project
PT WILMAR NABATI INDONESIA, Gresik

Pakugajah Kuang Project
PT ARTHA TEHNIK, Sumatera

Agitator Tank 300KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten

Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)

Power Plant ; Erection Limestone & Silica Sand Silo Project
PT. Asahimas Chemical – Anyer, Banten

2016

Piping & Installation Equipment (Filter Press) Project
PT. Hans Jaya Utama, Kawasan Krakatau Industry – Cilegon – Banten

Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)

New Filling Line & New Filling Chiller & Steam Project
PT PARAMITA BANGUN SARANA, Marunda

Demin Tank CAP.180KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten

P11 ITP Project
PT INDOCEMENT TUNGGAL PRAKARSA Tbk, Bogor

Tank Farm Biodiesel Project
PT WILMAR NABATI INDONESIA, Gresik

Pusri IIB Project (Additional Work) Project
PT TOYO ENGINEERING COORPORATION, Palembang

Storage Tank Project
PT WAHANA CITRA NABATI , Pulogadung

New Filling Line & New Filling Chiller & Steam Project
PT PARAMITA BANGUN SARANA, Marunda

Demin Tank CAP.180KL Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten

P11 ITP Project
PT INDOCEMENT TUNGGAL PRAKARSA Tbk, Bogor

Tank Farm Biodiesel Project
PT WILMAR NABATI INDONESIA, Gresik

Pusri IIB Project (Additional Work) Project
PT TOYO ENGINEERING COORPORATION, Palembang

Storage Tank Project
PT WAHANA CITRA NABATI , Pulogadung

Chiller Water Project
PT DOVER CHEMICAL Tbk – Merak, Cilegon – Banten

Repair Paint HRSG-8 Project
PT. CIKARANG LISTRINDO, Cikarang

TA 1069-C03-PM 03088 Project
PT PARAMITA BANGUN SARANA, Tarjun

Install & Repair FA#1 & 2 Project
PT WILMAR NABATI INDONESIA, Gresik

Semen Rembang Raw Mill Project
PT SEMEN GRESIK, Gresik

BIY Tank 1-2 RepairProject
PT SMART TbK, Marunda

2015

Installation VAC Unit (Blower & Chiller ) Aeon Mall Project
PT. ART Cool – Tangerang BSD – Banten

Installation Mechanical & Structure TPJ-2 Project
PT. Toray Polytech Jakarta – Tangerang – Banten

Refractory Work ( Castable & Firebrick Application )
For LOTTE Engineering & Construction Indonesia ASC Phase VI Project
PT. Asahimas Chemical – Anyer, Cilegon – Banten

Fabrication Of Vessel 13 (Thirteen) Sets & Installation Project
PT. Daekyung Indah Heavy Industry – Cilegon – Banten

Installation Blower Unit 51 (Fifty One) Unit & LPG Tank Aeon Mall Project
GS Neotek Vietnam & Powertech Indonesia – Tangerang BSD – Banten

Installation Work for Alignment Auto Clave at PT. Broco Project
PT. Daekyung Indah Heavy Industry – Cilegon – Banten

Sub Con PT. PUTRA DUMAS LESTARI (Insulation Only)

Hot Insulation Work Equip, Pipe & Duct Project
PT INDO BHARAT RAYON, Purwakarta

Blasting & painting Steel Structure Project
PT. MERAK ENERGI INDONESIA, Merak – Banten

Perlite NH3 Tank Project
PT. PUPUK KUJANG, Cikampek

PLTU 2X140 MW Project
PT. APECO KENCANA, Babelan

Indarung VI Cement Plant Project
PT SEMEN PADANG, Padang

Beading Tank Cap,235 MT Project
PT WILMAR NABATI INDONESIA, Gresik

Surabaya Refinery 3 Supply Tracing OSBL Project
PT PARAMITA BANGUN SARANA, Surabaya

Pusri STG & Coal Boiler Project
PT. REKAYASA INDUSTRI, PALEMBANG

Steam Pipe Line GT#2 To Header MPS Project) Project
PT WILMAR NABATI INDONESIA, Gresik

BUFFER TANK 200t Project
PT PARAMITA BANGUN SARANA, Surabaya

Pulau Sambu Fuel Storage Terminal Project
PT. WIJAYA KARYA, Riau – Batam

Lubuk Gaung Refinery Project (D6 1 Unit) Project
PT PARAMITA BANGUN SARANA, Dumai

Boiler Line Piping BKP Project
PT BINA KARYA PRIMA, Marunda

RPO-RPS Pipeline Texturing Line 5 Project
PT WILMAR NABATI INDONESIA, Gresik

STEAM PIPING Project
PT. DAYA CIPTA ANUGRAH, Citeureup

HOT PIPING Project
PT WIRAJAYA PACKINDO, Sadang

HOT PIPING Project
PT WILMAR NABATI INDONESIA, Cilegon – Banten

JETTY A EXTENTION Project
PT WILMAR NABATI INDONESIA, Gresik

Sub Con PT. DUTA UTAMA TEHNIK ABADI (Tank Only)

Storage Tank Erection, 6 unit, Cone Roof Type, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten

Storage Tank Erection, 3 unit, Cone Roof Type, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten

Storage Tank Erection, 3 unit, Sandblasting & Painting Work Project
PT. Asahimas Chemical – Anyer, Banten

2014

Refractory Work ( Castable & Ceramic Fiber Application )
For LR – 2 Refinery Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

Refractory Work ( Castable & Ceramic Fiber Application )
For JGCS / Nghi Son Refinery & Petrochemical, Vietnam ‘ NSRP’ Project
Furnace Engineering INC. Yokohama, Japan
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

Refractory Work ( Castable & Ceramic Fiber Application )
For ARL UPGRADATION Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

Refractory Work ( Castable & Ceramic Fiber Application )
For PUSRI B2 Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

TAR-2014 General Static Job Package ( Oxidation & PTA )
PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten

TAR-2014 SWI Job Package
PT. BP Petrochemicals Indonesia, Tanjung Gerem, Merak – Cilegon , Banten

Installation Blower Unit 30 (Thirty) at AEON Mall Project
PT. Plant Samyoung Indonesia, Tangerang BSD – Banten

Installation Genset Unit 8 (Eighty) at AEON Mall Project
PT. Kointec Engineering, Tangerang BSD – Banten

Mechanical Fabrication Work Project
PT. Daekyung Indah Heavy Industry, Cilegon – Banten

Fire Fighting System Installation Project
PT. Plant Samyoung Indonesia, Tangerang BSD – Banten

Installation Chiller Unit 5 (Five) Unit at Aeon Mall Project
PT. ART Cool, Tangerang BSD – Banten

Piping Work Coke Tar LP Unit Project
PT. Daekyung Plantec, Posco KS – Cilegon – Banten

Installation & Allignment Auto Clave Project
PT. Daekyung Indah Heavy Industry, PT. Broco ACI – Banten

Fabrication & Installation Assembly Project
PT. Chosun Raya Indonesia, Posco KS – Banten

2013

Refractory Work ( Castable & Ceramic Fiber Application )
For Boustead International Heaters Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

Refractory Work ( Castable & Ceramic Fiber Application )
For TAIF – NK VCC LLE2 Project
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

Refractory Work ( Castable & Ceramic Fiber Application )
For JGC / PETRONAS TRAIN-9 Project
Furnace Engineering INC. Yokohama, Japan
PT. Hanjung Indonesia-Srengsem Panjang, Bandar Lampung

“8” HVGO Piping Work Relocation Work Project
PT. CAZ Konstruksi – Dumai – Riau – Sumatera

Fabrication & Installation Assembly Project
PT. Chosun Raya Indonesia, Posco KS – Banten

2012

Installation Mechanical & Structure TPJ-1 Project
PT. Toray Polytech Jakarta – Tangerang, Banten

Mechanical & Piping Work (Conveying System) Project
PT. CAZ Konstruksi – Dumai – Riau – Sumatera

2011

100 MPTD Sago Starch Factory, Mechanical & Piping Work for 2nd Phase Work
PT. CAZ Konstruksi – Dumai – Riau – Sumatera

Menu